Skip to Main Content »

Search Site
Your shopping cart is empty
Orca 0.42 Manual - Part 5 - Y-sides pre-assembly


01 - Preparation / collecting all parts
(lists of bolts etc coming later)
picture


02 - Preparation of the four lm8uu holder parts
Push in the lm8uu bearing, you should hear a "click" / snap fit.
picture


02 - Preparation of the two ACME nut holder parts
picture picture

picture

picture


04 - Assemble the Y sides
(note: there is a left and a right version)
Dont fully tighten the bolts/nuts yet, but tighten them almost (90-95%), so they are still able to move a bit. (fully tightening will be done later in the frame)
picture

picture

picture



Click here to go to Part 6 - YZ frame assembly